Western Michigan University - Kalamazoo, MI Campus wide upgrade of fire alarm system including severe weather and emergency paging systems. Design incorporates integration and networking of building alarm system back to campus Public Safety Central Dispatch.
|
Lincoln Park Lafayette Elementary School - Lincoln Park, MI New 53,000 square foot elementary school building. Mechanical, electrical and structural engineering. Gymnasium, kitchen, media center, administrative offices, and 30 classrooms. Construction cost $3.5 million.
|
Lincoln Park Middle School - Lincoln Park, MI New 150,000 square foot two story middle school building. Mechanical, electrical and structural engineering. Gymnasium, kitchen, locker rooms, media center, computer room, administrative offices, and 56 classrooms. Construction cost $10 million.
|
Lincoln Park High School - Lincoln Park, MI Boiler plant upgrade to replace four 300 HP low pressure steam boilers with three new steam boilers. Mechanical, electrical, and structural engineering. Remove and replace existing roof structure for boiler access and installation of new boiler stacks. New power service upgrade and boiler controls.
|
Lincoln Park Raupp Elementary School - Lincoln Park, MI New 43,000 square foot elementary school building. Mechanical, electrical and structural engineering. Gymnasium, kitchen, computer room, media center, administrative offices, and 20 classrooms. Construction cost $3.6 million.
|
Newaygo Tech Center - Fremont, MI New 26,000 square foot technical training center. Mechanical, electrical, and structural engineering. Design features included interface with audio/visual systems in meeting room and special isolated ground requirements for computer room with emergency power disconnect switching. Construction cost $2.5 million.
|
Newaygo County ISD Technical Training Center - Fremont, MI Renovations to 90,000 square feet of occupational technical training center. Mechanical and electrical design completed in two phases. Construction cost $1.2 million.
|
Newaygo ISD Activity Center - Fremont, MI New 7,200 square foot Intermediate School District facility for the education of mentally and emotionally impaired children. Mechanical and electrical engineering. Construction cost $700,000.
|
Waverly Community Schools - Elmwood Elementary School - Lansing, MI Renovation of 24,000 square foot elementary school building with 7,200 square foot classroom addition. Mechanical, electrical and structural engineering. New HVAC system and new lighting throughout. Gymnasium, kitchen, media center, and classrooms. Construction cost $2.5 million.
|
Waverly Community Schools - Windemere Elementary School - Lansing, MI Renovation of 25,000 square foot elementary school building with 7,600 square foot addition. Mechanical, electrical and structural engineering. New HVAC system and new lighting throughout. Gymnasium, kitchen, media center, and classrooms. Construction cost $2.7 million. |