Go Back to Project Experience

Stockbridge-Munsee Health Center - Bowler, WI

New 25,000 square foot, two story medical office building on Native American Reservation. Mechanical, electrical and structural engineering. Load bearing masonry construction with steel bar joist floor and roof structure. Power distribution, emergency generator, and lighting design. HVAC, plumbing, and fire protection design. Construction cost $3.0 million.

 

Spectrum Health Breast Care Services - Grand Rapids, MI

Renovation of 10,000 square feet at the Blodgett Campus for the Betty Ford Clinic. Radiology office and administration, patient waiting, ultra-sound/mammography rooms, recovery and exam/procedure rooms. Design included HVAC, plumbing, medical gases, new nurse call, emergency power systems, electrical power and lighting. Construction cost $800,000.

 

Battle Creek Medical Office Building - Battle Creek, MI

New 42,000 square foot two story medical office building. Mechanical engineering included HVAC, plumbing, and fire protection. Electrical engineering included lighting and power distribution. Structural engineering included structural steel framing, steel joists, and wood trusses. Construction cost $3.7 million.

 

Spectrum Health Radiation Oncology - Grand Rapids, MI

New 3,000 square foot addition to the Butterworth Campus for new CT scan and linear accelerator equipment, plus 1,400 square foot renovation to the present Radiation Oncology Clinic. Remodeled areas included construction of administration, patient waiting, and exam rooms. The site presented many challenges including significant elevation changes and maintaining emergency exiting requirements from the main hospital. Special reinforced concrete construction for radiation shielding. Construction budget $1.6 million. This project was not constructed due to budget constraints at the hospital.

 

Caro Community Hospital Additions and Renovations - Caro, MI

New 15,000 square foot two story addition. The addition consists of an entrance, lobby, gift shop, chapel, registration desks, conference room, blood draw, laboratory, cardio-stress test, exam room, waiting room and utility rooms. Electrical engineering for power and lighting design. Structural engineering of steel frame structure with precast concrete floors and light gage metal roof trusses. Construction cost $2.6 million.

 

MMPC Cardiology Suite - Grand Rapids, MI

Renovation of 4,200 square feet for tenant relocation. Existing power & heat pump system expanded to serve three new camera rooms, exam rooms, doctor’s offices, and nurse station. Construction cost $300,000.

 

MMPC Imaging Suite - Grand Rapids, MI

Renovation of 7,800 square feet for new CT Scan equipment. Expansion includes relocation of existing general X-ray, bone densitometry, office and toilet rooms. Add new mammography, radiology office, ultrasound, and waiting rooms. Expand existing waiting, break, and MIS rooms. Construction cost $226,000.

 

Pennock Hospital - Hastings, MI

Major renovation of laboratory, outpatient care, emergency room, and radiology departments. Mechanical, electrical, and structural engineering. Expansion of the existing fire alarm and nurse call systems. New HVAC system for laboratory area. Evaluation of standby power capacity for entire facility. Design to accommodate phased construction. Construction cost $2.0 million.

 

Spectrum Health Ambulatory Surgical Center (ASC) - Kentwood, MI

New 28,236 square foot tenant fit up within Hughes Medical Office Building. Tenant fit-up consists of 8 operating rooms and 30 patient rooms. Mechanical engineering included HVAC, plumbing, medical gas, and fire protection. Electrical engineering consisted of lighting and power distribution, phone, data, fire alarm, security, and design of emergency generator. Construction cost $3.5 million.

 

Hughes Medical Office Building Shell - Kentwood, MI

New 114,150 square foot new medical office building. Building designed as a “white box” for future tenant occupancy. Mechanical engineering included HVAC, plumbing and fire protection. Electrical engineering included site lighting, interior lighting and power distribution, phone, data, security, fire alarm, and emergency generator system. Construction cost $9.0 million.

 

South Haven Community Hospital Women’s Center - South Haven, MI

New 15,800 square foot medical office building addition. The addition includes offices, exam rooms, procedure rooms, lab, and nurse stations. Mechanical design included HVAC, plumbing, fire protection, and medical gases. Electrical design included electrical power and lighting, fire alarm system, sound system, and new nurse call system. Construction cost $2.4 million.

 

South Haven Community Hospital Renovations - South Haven, MI

Renovation of offices, mammography, ultra-sound rooms, stress test rooms, bone density, conference rooms, serving and dining areas, oncology suite, and radiology department. All provisions for new mobile MRI. Electrical design included electrical power and lighting, fire alarm system, sound system, and new nurse call system. Mechanical design included HVAC, plumbing, and medical gases. Construction cost $1.3 million.

 

Battle Creek Family Health Services - Battle Creek, MI

New 32,000 square foot outpatient medical treatment facility. Mechanical, electrical, and structural engineering. Mechanical engineering included HVAC, plumbing and fire protection. HVAC system utilized closed-loop water source heat pump system. Electrical systems included power, lighting, and fire alarm system. Structural system included steel joist and concrete floors, structural steel frame and wood roof trusses. Construction cost $3.5 million.

 

Pennock Hospital - Hastings, MI

Mechanical, electrical, and structural engineering on numerous projects completed in the Main Hospital, Professional Office Building, and Physicians Center. Projects include Laboratory renovation, Emergency Medicine, Occupational Medicine, Radiology, CT Scan renovation, Sleep Lab renovation, Respiratory Care - Physical Therapy renovation, and Pharmacy renovation. All projects phased to accommodate continuing operations.

 

Spectrum Health Clinical Lab - Grand Rapids, MI

Renovation of existing 2,800 square foot Clinical Laboratory. Remodeled areas include Office, Reprocessing, Gross-Cut, Chemistry Lab, and Lab Central. Phased construction to minimize disruption to current laboratory operations and surgical suite located directly above lab.

 

Spectrum Health Endoscopy - Grand Rapids, MI

Mechanical and electrical engineering for 13,000 square foot ambulatory outpatient clinic with preparation rooms, procedure rooms and recovery rooms. Construction cost $1.4 million.

 

Gerber Memorial Services Hospital - Fremont, MI

New surgery and radiology addition and renovation of approximately 32,000 square feet on three floors of the facility. Electrical engineering of power distribution, lighting design including branch circuiting and switching, telephone and data processing system provisions, fire alarm system design, nurse call system design, and site lighting design. Construction cost $2.0 million.

 

Michigan Pain Clinic - Kentwood, MI

New medical office tenant fit-up of 12,000 square feet. Mechanical and electrical engineering. Construction cost $750,000.

 

MMPC Weight Management Suite - Grand Rapids, MI

Tenant fit up design for new 5,000 square feet space. Mechanical and electrical engineering. Construction cost $250,000.

 

MMPC Colo-Rectal Clinic - Kentwood, MI

Tenant fit up for 12,500 square feet for Colo-Rectal out patient clinic. Mechanical and electrical engineering. Construction cost $750,000.

 

Porter Hills Presbyterian Village - Kentwood, MI

Upgrades to HVAC systems in the primary kitchen facility and adjacent administrative offices.

 

Sparrow Hospital - Lansing, MI

Miscellaneous mechanical, electrical, and structural engineering for various small projects including Pharmacy Renovation and Café Renovation. Coordination with building code officials and state health department officials.

 

Spectrum Health Blodgett Campus MRI Building - East Grand Rapids, MI

New 1,000 square foot modular MRI building. The building superstructure along with integral MRI unit is constructed off site at the manufacturers facility, then delivered to the site, placed on a new foundation system and connected to all necessary utilities. Mechanical, electrical, and structural engineering.

 

Spectrum Health Rehabilitation Center - Rockford, MI

Tenant fit-up of 2,500 square foot rehab center located within the Champion Fitness Center building. Mechanical and electrical engineering.

 

Spectrum Health Radiation Oncology - Rockford, MI

Tenant fit-up of 4,200 square foot radiation oncology clinic within Champion Fitness Center building. Mechanical and electrical engineering. Construction cost $315,000.

 

Borgess Medical Center North Professional Building - Kalamazoo, MI

Renovation of 22 year old medical office building. Mechanical and electrical engineering. New HVAC, fire protection, and lighting systems. Construction cost $300,000.

 

Bronson Vicksburg Hospital - Vicksburg, MI

Study and report evaluating existing power distribution, emergency generator and fire alarm systems.

 

Michigan Medical Professional Corporation (MMPC) - Grand Rapids, MI

Various tenant fit-up and renovation projects including Pulmonary Clean Room, Information Services, Imaging expansion, and Cardiology.

 

Michigan Pain Clinic Projects - Grand Rapids, MI

Various renovations to offices and therapy rooms including Clinical Office, Therapy Pool, and Pain Clinic expansion.

Go Back to Project Experience