![]()
East Grand Rapids Public Safety Building - East Grand Rapids, MI Renovation and expansion of 11,000 square foot Police and Fire Safety Department. Mechanical, electrical, and structural engineering. New variable air volume HVAC system and upgrade of communications systems, power and lighting. The project included conversion of an existing cast-in-place concrete water storage reservoir into locker rooms and parking for public safety vehicles. Construction cost $1.0 million.
|
East Grand Rapids Chiller Replacement - East Grand Rapids, MI Installation of new 160 ton air-cooled screw chiller serving City Hall, Library, and Public Safety buildings. Mechanical, electrical, and structural engineering. Chiller replacement included new circulating pump, chilled water piping, and controls. Chiller installation included cast-in-place concrete enclosure to minimize noise transmission to adjacent buildings and is supported by an auger-cast concrete pile foundation system. Construction cost $300,000.
|
Grand Rapids Parking Services - Grand Rapids, MI Renovation and expansion of 8,400 square foot of office space currently occupied by G.R. Parking Services. The renovation included HVAC system upgrade with addition zone control and cooling capacity. Construction cost $250,000.
|
Grand Haven City Hall Renovations - Grand Haven, MI Renovation of City Council Chambers, barrier free toilet rooms, and barrier free ramps with snow melt system. Mechanical, electrical, and structural engineering. New audio visual system in Council Chambers including custom console and motorized projection screen. Construction cost $250,000.
|
Zoll Street Administration and Police Buildings - Harbor Springs, MI Renovation and additions to two existing buildings constructed in the early 1900's. Mechanical, electrical, and structural engineering. Mechanical system includes four pipe fan coil system with chiller and boiler. Electrical system includes stand by generator system and special security system for locking control at doors. Construction cost $1.0 million.
|
Whitehall Rail to Trail Pedestrian Bridges - Whitehall, MI Structural engineering of three timber bridges serving bicycles and pedestrians on “Rails to Trails” extension. Pressure treated wood pile foundation system. Construction cost $150,000.
|
East Grand Rapids Remington Field - East Grand Rapids, MI Structural engineering for special helical pile foundation system for new toilet facilities at city park. Construction cost $250,000.
|
East Grand Rapids Salt Storage Building - East Grand Rapids, MI Structural investigation and repair recommendations. Major structural repairs and replacement of damaged roof truss system. Construction cost $150,000.
|
Municipal Building Code Plan Reviews - Throughout Michigan Provide mechanical and structural building code plan review service for various commercial buildings for City of Rochester Hills, Gaines Township, Grand Haven Township, Georgetown Township, Jamestown Township, and for the Little Traverse Bay Band of Odawa Indians. |