Holy Childhood of Jesus Catholic Church
Harbor Springs, Michigan |
 |
 |
- $2.3 million renovation
and addition to existing church constructed in late
1800's
- Worship space was doubled in
size without changing the appearance of the original
facility
- Structural analysis of existing
heavy timber roof trusses revealed that the entire
existing roof structure needed to be removed and replaced
|
|
- Mechanical engineering included
HVAC design, boiler replacement, and a new snow melt
system in the sidewalks
- Electrical engineering included
interior power distribution, circuiting for lighting,
telephone and data provisions, fire alarm design and
lightning protection design
|
|