Holy Childhood of Jesus Catholic Church
Harbor Springs, Michigan

  • $2.3 million renovation and addition to existing church constructed in late 1800's
  • Worship space was doubled in size without changing the appearance of the original facility
  • Structural analysis of existing heavy timber roof trusses revealed that the entire existing roof structure needed to be removed and replaced

  • Mechanical engineering included HVAC design, boiler replacement, and a new snow melt system in the sidewalks
  • Electrical engineering included interior power distribution, circuiting for lighting, telephone and data provisions, fire alarm design and lightning protection design