Spectrum Health South Pavillion - Fixed MRI
Gaines Township, Michigan
  • $900,000 construction cost
  • Engineering services for new fixed 1.5T MRI addition to the South Pavilion off-site surgical facility
  • A temporary Mobile MRI dock was designed and constructed prior to starting the fixed MRI addition which was completed in 6 months
  • Special vibration isolation foundation system for the MRI equipment
  • Special copper shielding enclosure for the MRI room
  • Mechanical systems provide for temperature and humidity, medical gases, and pre-action dry pipe  fire suppression system
  • Electrical systems include lighting design with motion detection, power distribution with branch circuiting, nurse call systems, music system, emergency generator power, security and fire alarm, and a DC dimming system